Studies and Projects

  • Work relating to drafting the project and site management of a service and evacuation tunnel parallel to Envalira tunnel. Civil engineering works and installations. Parròquia d'Encamp.
  • Construction project for the resumption of affected services at the C-31b road roundabout. Section: Tarragona.
  • Sant Julià bypass construction project. Installations relating to La Tàpia Tunnel and accesses thereto.
  • Technical assistance for the drafting of the general improvement construction project. Refurbishment and improvement of the C-221 road. Section: boundary with Aragó – Batea bypass. Public lighting installations.
  • Construction project. General improvement. New Vic-Olot road. C-37. Section: Bracons-Sant Esteve d’en Bas (La Vall d’en Bas) Tunnel north opening. Installations relating to La Codina, La Famada and La Carrera tunnels.
  • Technical project for updating the SOS Post system in the Tunnels of Barcelona’s Ronda Litoral ringroad.
    • Colom tunnel (417 m).
    • Pla de Palau tunnel (455 m).
    • Vila Olímpica tunnel (812 m).
    • Poble Nou tunnel (507 m).
    • Bon Pastor tunnel (320 m).
    • Baró de Viver tunnel (170 m).
  • Drafting of the construction project for the installations to cover the Ronda Litoral ringroad between Sant Ramon de Penyafort and Rambla Prim.
    • Sea side tunnel (210 m).
    • Central core tunnel (370 m).
    • Mountain side tunnel (350 m).
    • Facilities: electric distribution and switching system with generator set, normal and emergency lighting, SOS posts, public address system, CCTV, traffic lights, instrumentation and Gigabit Network integration.
  • Technical assistance for the drafting of the construction project relating to the extension of FMB line 5. Section: Horta-Vall d’Hebron. Architecture and Installations. €885,600.00