Studies and Projects

Geology and Geotechnics

  • Technical assistance for the drawing up of the project for the construction of the extension of FMB Line 2 between Sant Antoni and Parc Logístic (connecting with line 9). Infrastructure, track and catenary superstructure. €1,018,132.14
  • Technical assistance and consulting for the carrying out of geotechnical studies. Section: Gabaldón – Villagordo del Júcar of the “New High Speed Access to the Levante regions (Nuevo Acceso de Alta Velocidad a Levante) Castile la Mancha – Madrid Autonomous Region. Valencian Autonomous Region – Murcia Region”. €190,961.23
  • Prat Desalter. Preloading project and follow-up (EE-1-03-06-013) €36,309.52.
  • Review of GISA’s Geology and Geotechnics technical specifications for information studies and projects in relation to roads and transport.
  • Geotechnical study for the new wharves in the Barcelona Port extension area. €1,087,175.10
  • Geotechnical study for the new wharves in the Barcelona Port extension area. €937,292.69
  • Geological and geotechnical study for the High Speed line. Madrid – Barcelona – Zaragoza – French border. Section: Castellbisbal-Papiol in Barcelona. €329,125.67
  • Geological and geotechnical study and construction project for the Collado tunnel. Section: south branch. Salines tunnel at Casa de Vilaire, Mónvar municipal area in Alicante. Field work and laboratory testing. €284,506.91
  • Geotechnical study. Terrassa. €274,446.19
  • Geological and geotechnical study of the Carrer Mallorca Tunnel (Section: Carrer Vilamarí – Carrer Bailén) of the Barcelona high speed line entrance. €174,293.51
  • Technical Assistance for the following up of the comparison of the Metro Line 5 Tunnel tests and convergences. €140,976,19
  • Geological risk study in the town of Valls del Valira. €23,539.05
  • Rock block slide studies in the Principality of Andorra. €15,432.47.
  • Geotechnical study on possible problems in the foundation of a set of industrial buildings located above the tunnels of the cellars in Cervelló. €19,475.20
  • Carrying out of various rock block slide studies for 2008 in relation to the Canillo slope, Cantina de Racons and the entrance to the Dos Valires tunnel. €7,500.00
  • Construction project and site management of two rows of anchors and drainage to repair and stabilise the slope located in a Nou Gilida Residencial development in Gelida. €72,857.86
  • Carrying out of the complementary works for the “General Improvement. Conditioning of Guardiola de Berguedà” Construction Project in Gombrèn”. GI-410 road. Km 0+000 to 6+150. Section: Campdevànol – Xoriguera. €7,010.45
  • Provision of an estimate to the Batlles Court Administrative Section for the drawing up of an expert report for legal proceedings AD-148-1/97 with the following parties: Bon Repòs building owners’ association (claimant) / Andorra la Vella town council and Andorra Government (defendant). €8,200.00.
  • Technical assistance for the drawing up of the geological and geotechnical study for the cutting for the C-38 road between Km 11+200 (end of the Camprodón crossroad) and 13+600 (intersection with GIV-5223, Beget exit) to Camprodón. €11,449.20
  • Follow-up works and technical advice regarding a landslide on a slope in La Massana. €1,300.00

©2012 Euro Geotecnica
Avgda. Corts Catalanes 5-7, 2a planta - 08173 Sant Cugat del Vallès (BCN) - Tel. +34 93 583 04 80 Fax +34 93 583 69 60