Site Management

  • Management of the works on the extension of the FGC Trains to Terrassa. Infrastructure, track and catenary superstructure. Section: Terrassa-Can Roca tunnel. €1,666,666.66
  • Management of the works: Modified project no. 1 relating to infrastructures, superstructures and electrification of line 5. Section: Horta-Vall d’Hebron: Carmel.
  • Supervision for the Andorran Government’s Ministry of Land Use and Planning (Ministeri d’ordenament territorial) of the Envalira Tunnel and accesses concession works. €730,229.71
  • Site management of the Dos Valires tunnel. €589,499.00
  • Project and site management of the works on La Vall del Nord tunnel, Phase 1: Tunnel excavation and support; and Phase 4: Continuous boring of the Evacuation Tunnel. €605,820.20.
  • Management of the works: Project for the repair of leaks in the Barcelona Metropolitan Railway (FMB) network. Rambla Just Oliveres L1. Project for the repair and removal of leaks in the Baró de Viver and Trinitat Vella stations and tunnel in Line 1. €186,538.25.
  • Management of the Bracons Tunnel works. €185,630.00.
  • Follow-up of the health and safety coordination work on the works to repair the 117 and 121 slopes of the FGC Lleida – La Pobla de Segur line. €11,948.00

©2017 Euro Geotecnica
Avgda. Corts Catalanes 5-7, 2a planta - 08173 Sant Cugat del Vallès (BCN) - Tel. +34 93 583 04 80 Fax +34 93 583 69 60