Site Management

  • Project and site management of the installations in Pont Pla tunnel and Sant Antoni tunnels:
    • Ventilation and lighting installations.
    • Communication and control installations.
    • Traffic light and access control installations.
    • Andorra Tunnels control centre.
  • Project and site management of the installations for covering the road tunnels in the Ronda Litoral ringroad between Sant Ramon de Penyafort and Rambla Prim (Fòrum tunnels).
    • Sea side tunnel (210 m).
    • Central core tunnel (370 m).
    • Mountain side tunnel (350 m).
  • Supervision of the Envalira Tunnel construction works (2,850 m). Civil Engineering Works and Installations, and review of construction projects.
    • Facilities: electric distribution and switching system with generator set for 400 V and 690 V supply, reversible semi-transversal ventilation system, surveillance and control security system: (communications network (4 UREs and PLCs, SOS post system, CCTV, AID, control centre, ventilation instrumentation), telecommunication systems (PMR, GSM and radiating cable).

©2017 Euro Geotecnica
Avgda. Corts Catalanes 5-7, 2a planta - 08173 Sant Cugat del Vallès (BCN) - Tel. +34 93 583 04 80 Fax +34 93 583 69 60